Maintenance and operational strategy
The RIBA Plan of Work 2013 defines the Maintenance and Operational Strategy as: ‘The strategy for the maintenance and operation of a building, including details of any specific plant required to replace components.’
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to maintenance and operational strategies: “These define how systems will be maintained and by whom, and should also cover commissioning and user guidance. The maintenance and operational requirements of various systems inform and influence the initial project brief. Therefore, knowing who and how systems will be maintained, and filters will be changed, impacts upon the location and space planning of the mechanical ventilation heat recovery units. Also, to assist with the measurement, calibration and commissioning of building services equipment, a Commissioning Plan and Programme should be developed, reviewed, updated, and implemented by the project team. Commissioning may be undertaken at various points prior to completion – to allow fault finding/remediation – and then at agreed intervals during the defects liability period (and later) – to verify that the systems comply with the construction documents/contract and design intent. More broadly, to support the daily use and operation of the building, appropriate guidance for each user group should be provided in the form of a quick start user guide. Refer to RIBA Plan for Use for supporting information.”
[edit] Related articles on Designing Buildings
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.